Qingcare

4 min read

Switching suppliers without losing the specification

Most failed switches fail at the specification, not at the price.

Reverse-engineer what you already buy

Before asking for a quotation, write down what the current product actually is: blend, basis weight, dimensions, fold, pack count. If the incumbent will not provide these, measure them — weight per sheet and dimensions will get you most of the way.

A quotation against a vague brief cannot be compared with the current supply, and the comparison is the entire point of switching.

Run a parallel batch, not a pilot

Order a production-sized batch and put it into service alongside the current product, in the same week and the same conditions. Side-by-side in a busy week tells you more than a sample folder.

Keep the approved sample and the batch reference. When the second shipment arrives, that is what you compare against.

All guides

Send us the specification you are working to.

A target weight, a pack format, a market and an annual volume is enough to start. A sample of what you use today is better.